C53-33 Fast-Drying Alkyd Anticorrosive Primer
Fast-drying alkyd anti-corrosive primer for steel structures, machinery and equipment where throughput matters more than extreme service life.
View productThis is a two-component, chemically curing fluoropolymer coating.
This is a two-component, chemically curing fluoropolymer coating.
This is a two-component, chemically curing fluoropolymer coating. It has excellent gloss and colour retention. It has good adhesion and scrub resistance. With low surface energy, the film has good stain resistance and is easy to clean.
For applications where high-standard decorative appearance and beautification under severe climatic conditions are the main requirements, e.g. stadiums, bridges, offshore platforms, chemical and petrochemical plants, paper mills and the power industry. Protective coating suitable as a topcoat in C1-C5 and CX atmospheric corrosive environments.
Matched to colour chart
| Performance | Test/Standard | Description |
|---|---|---|
| Solids by volume | ISO 3233 | 43±2% |
| Gloss (GU 60 °) | ISO 2813 | Glossy |
| Flash point | ISO 3679 Method 1 | 30℃ |
| Density | Theoretical value | 1.25Kg/L |
The data listed are based on laboratory tests and may vary slightly in actual factory batch production. All data are valid for the mixed white paint; data for other colours may vary slightly.
Dry film thickness 40μm - 80μm
Wet film thickness 93μm - 186μm
Theoretical spreading rate 0.12Kg/m2 - 0.24 Kg/m2
To ensure lasting adhesion of the subsequent coat, all surfaces must be clean, dry and free from contamination.
| Substrate | Surface preparation | |
|---|---|---|
| Minimum | Recommended | |
| Painted surfaces | Clean, dry and intact compatible primer (in compliance with ISO 12944-4 6.1 standard). | Clean, dry and intact compatible primer (in compliance with ISO 12944-4 6.1 standard). |
The product can be applied by Spray: Use air spray or airless spray. Brush: Recommended for stripe coating and small areas. Care must be taken to achieve the specified dry film thickness
JDFC04-34 Fluorocarbon Topcoat Component A 8 parts JDFC04-34 Fluorocarbon Topcoat Component B 1 part
Thinner: Jindun 109 Thinner
Nozzle tip (mm): 0.4~0.5 Pressure at nozzle (minimum): 15MPa
| Substrate temperature | 5℃ | 10℃ | 23℃ | 40℃ |
|---|---|---|---|---|
| Surface (touch) dry | 8 hours | 5 hours | 2 hours | 1 hour |
| Walk-on-dry | 36 hours | 24 hours | 24 hours | 12 hours |
| Dry to overcoat, minimum | 24 hours | 18 hours | 12 hours | 4 hours |
| Dried/cured for service | 15 days | 10 days | 5 days | 2 days |
For maximum overcoating intervals, please consult Jindun technical personnel.
The drying and curing times are measured based on temperature and relative humidity, with relative humidity below 85%
and dry film thickness within the average dry film thickness range.
Surface (touch) dry: The state of drying when slight pressure with a finger does not leave an imprint or reveal tackiness.
Dry to over coat, minimum: The recommended shortest time interval before the next coat can be applied.
Walk-on-dry: Minimum time before the coating can tolerate normal foot traffic without permanent footprints, marks or
other physical damage.
Dried/cured for service: Minimum time before the coating can be permanently exposed to the intended
environment/medium.
Pot life 2 hours
Continuous Peak Dry, atmospheric environment 120℃ 130℃ It resists most oils, aliphatic petroleum products and non-aggressive chemicals in spillage situations. The peak temperature can be tolerated for a maximum of one hour. At the above temperatures, the protective properties are not affected. However, the appearance may be affected.
Depending on the actual exposure conditions in service, this product can be used in combination with different primers and topcoats. Some reference systems are shown below. For specific systems, please contact Jindun. Previous coat: epoxy, zinc-rich epoxy, modified epoxy, polyurethane Subsequent coat: fluorocarbon coatings
| Weight | Container size | |
|---|---|---|
| (Kg) | (litres) | |
| JDFC04-34 Fluorocarbon Topcoat Component A | 20 | 20 |
| JDFC04-34 Fluorocarbon Topcoat Component B | 2.5 | 3 |
Painting work should normally be carried out under climatic conditions of above 5℃, with the substrate temperature more than 3℃ above the dew point and relative humidity below 85%.
The product must be stored in accordance with national regulations. Keep the containers in a dry, cool, well ventilated space and away from sources of heat and ignition. Containers must be kept tightly closed. Handle with care.
JDFC04-34 Fluorocarbon Topcoat Component A 12 month(s) JDFC04-34 Fluorocarbon Topcoat Component B 12 month(s) The above is the minimum shelf life, after which testing is required to determine whether the quality is acceptable.
This product is for professional use only. Applicators shall be trained, experienced and capable, equipped with suitable equipment, and shall mix, stir and apply the coating in accordance with Jindun’s technical documentation. Appropriate personal protective equipment shall be worn during operation. This guideline is based on current product information; any application adjustment made to suit site conditions must be approved in advance by an authorised Jindun representative before it is carried out.
Please observe the precautionary notices on the container. Use under well ventilated conditions. Avoid inhaling spray mist. Avoid skin contact, In case of contact with skin, wash immediately with a suitable cleaner, soap and water. In case of contact with eyes, rinse thoroughly with water and seek medical attention immediately.
When used, products intended primarily as primers or antifoulings may show slight colour variations from batch to batch.
The information provided in this data sheet is based entirely on the knowledge gained in our laboratory and in practice. Jindun products are regarded as semi-finished goods, and the use of the products is generally beyond our control. Jindun therefore guarantees only the quality of the product itself. Products may be adjusted appropriately to comply with local regulations, and we reserve the right to modify this data sheet without prior notice. Users should consult Jindun for specific guidance on the suitability of the product for their own needs and specific applications.
Fast-drying alkyd anti-corrosive primer for steel structures, machinery and equipment where throughput matters more than extreme service life.
View productIron-red, fast-drying alkyd anti-corrosive primer — the traditional shop primer for structural steel and general fabrication.
View productA two-component epoxy anti-corrosive primer composed of epoxy resin, colour pigments, anti-corrosive pigments and a polyamide curing agent.
View productComposed of epoxy resin, polyamine curing agent, anti-corrosive pigments and fillers, micaceous iron oxide grey, anti-settling agent, solvent, etc.
View productThis is a two-component, chemically curing aliphatic acrylic polyurethane coating.
View productThis is a two component polyamide cured zinc epoxy coating.
View productThis is a two-component, moisture-curing, inorganic zinc silicate coating formulated with zinc dust.
View productThis is a two component amine cured epoxy coating.
View productThis is a two-component polyamine-cured epoxy coating containing micaceous iron oxide (MIO) pigments.
View productThis is a two component polyamide cured zinc rich epoxy coating.
View productThis is a two-component, moisture-curing, inorganic zinc silicate coating.
View productThis is a two component amine cured epoxy coating.
View productThis is a two component chemically curing aliphatic acrylic polyurethane coating.
View productThis is a two-component, high-solid, environmentally friendly topcoat based on organic-inorganic hybrid technology, forming a film on a high-bond-energy Si-O-Si molecular main chain.
View productThis is a two component polyamine cured epoxy mastic coating.
View productThis is a two-component polyamine-cured epoxy coating.
View productThis is a single component air dried aluminum powder heat-resistant paint.
View productThis is a two-component, silicone-modified, heat-resistant primer.
View productThis is a two-component polyamine-cured phenolic epoxy coating.
View productThis is a two-component, silicone-modified, heat-resistant primer.
View productThis is a one component physically drying silicone acrylic coating.
View productThis is a two-component, moisture-curing, inorganic zinc silicate coating formulated with zinc dust.
View productThis is a two-component, silicone-modified, heat-resistant primer.
View productThis is a one component physically drying silicone acrylic coating.
View productThis is a one component physically drying silicone acrylic coating.
View productTell us the substrate, service environment and area to be coated — we will confirm availability, lead time and the matching primer and topcoat.