JDGuard4431 — Epoxy anti-rust primer
Role: Epoxy anti-rust primer
Position: Primer / First coat / Second coat
Below the waterline, the barrier is the system.
Systems: Im1–Im2
View productBelow the waterline, the barrier is the system.
Below the waterline, the barrier is the system.
Immersion changes the failure mechanism. The coating must resist water absorption, blistering and, in Im4, cathodic disbondment. Epoxy is the default chemistry; glass flake is used where the barrier or abrasion demand is higher.
Fresh, brackish and sea-water tanks, ballast and process vessels, splash-zone steel and cathodically protected structures.
Durability is a target, not a promise. ISO 12944 durability bands — low, medium, high and very high — describe the intended time to first major maintenance under the defined environment. They do not replace the project specification, the coating build or the inspection plan.
| System | Primer | Intermediate | Topcoat | Build |
|---|---|---|---|---|
| Im1–Im2 | JDGuard4431 | — | JDGuard4431 | 2 coats |
| Im1–Im2 (GF) | JDLst5331GF | — | JDLst5331GF | 2 coats |
| Im4 | JDEP390GF | — | — | per TDS |
Role: Epoxy anti-rust primer
Position: Primer / First coat / Second coat
Below the waterline, the barrier is the system.
Systems: Im1–Im2
View productRole: Glass-flake abrasion-resistant coating
Position: First coat / Second coat
Below the waterline, the barrier is the system.
Systems: Im1–Im2 (GF)
View productRole: High-build epoxy glass-flake coating
Position: Primer / Intermediate / Topcoat / Single coat
Below the waterline, the barrier is the system.
Systems: Im4
View productSa 2½–Sa 3; profile per the system; chloride and soluble-salt checks before the first coat. Stripe-coat welds and edges.
Measure DFT at intervals; holiday-test every tank; repair before release. For Im4 verify cathodic-disbondment and CP compatibility, cure before fill and confirm the glass-flake build.
Immersion is unforgiving. A pinhole, a missed stripe coat or an early fill will find the steel before the next survey does. Record batch, ambient conditions, DFT, holiday test and repairs in the asset file.
Send the substrate, environment category, durability target and service temperature — we will return the matched build and the current TDS.