Export enquiries welcome · GMT+8

Yangpu Bridge

Heavy-duty anti-corrosive coating system for a long-span cable-stayed bridge over the Huangpu River.

Yangpu Bridge
Infrastructure
Project facts
IndustryInfrastructure
LocationShanghai, China

Project background

A cable-stayed bridge in a tidal estuary exposes its steel to the full range of corrosive conditions: an atmospheric zone on the towers and deck, a splash zone at the waterline, and permanent humidity and salt loading from the river. Each zone needs a different protection strategy.

Client requirement

A heavy-duty coating system able to deliver a long maintenance interval on steel that is expensive and disruptive to access, in a humid, salt-laden urban environment.

Operating challenge

Bridge maintenance requires lane closures and traffic management that cost far more than the coating itself. Any premature breakdown means repainting sooner, at a multiples-higher total cost.

Our solution

Kindon heavy-duty systems were specified for the structural steelwork, using a high-build epoxy anti-corrosive build with a durable, colour-stable topcoat for the atmospheric zone and an immersion- and splash-resistant build at the waterline.

Products applied

  • Heavy-duty anti-corrosive primer
  • High-build epoxy intermediate coat
  • Durable protective topcoat

Project advantages

  • Heavy-duty system designed for long maintenance intervals
  • Zone-by-zone specification for atmospheric, splash and immersed areas
  • Manufactured under a CCS-approved factory quality system
  • Technical support on surface preparation and inspection

Related solutions

Infrastructure solutions All case studies

Start your project with Kindon

Send us the vessel type, service environment, coating area or annual volume — our engineers will respond with a recommended coating system.