
| Industry | Infrastructure |
|---|---|
| Location | Chuzhou, Anhui, China |
Project background
A large sports venue concentrates several demanding coating requirements in one project: long-span steel roof structures that are expensive to access once the building is in use, interior steel that must meet a fire-resistance rating, and a public-facing finish that has to look right on opening day.
Client requirement
The owner required a coating specification that would protect the primary steel structure over a long maintenance interval, satisfy the fire strategy for interior steel, and remain practical for the contractor to apply within the construction programme.
Operating challenge
Long-span roof trusses make later repainting costly and disruptive, so the initial specification carried most of the lifecycle risk. Interior steel had to be fire-protected without introducing solvent odour into enclosed spaces during fit-out.
Our solution
Kindon supplied a matched system: a heavy-duty anti-corrosive primer and high-build epoxy intermediate for barrier protection of the structural steel, a durable topcoat for weather and UV resistance, and JDFR-505 water-based intumescent fire-retardant coating for interior steel requiring a fire rating. Application support was provided to the contractor on surface preparation, DFT control and inspection hold points.
Products applied
- Heavy-duty anti-corrosive primer
- High-build epoxy intermediate coat
- Durable protective topcoat
- JDFR-505 water-based intumescent fire-retardant coating
Project advantages
- Matched primer–intermediate–topcoat system from a single manufacturer
- Water-based intumescent fire protection suitable for enclosed interior areas
- Documented surface preparation and DFT inspection hold points
- Produced under ISO 9001 / 14001 / 45001 certified management systems
Related solutions
Start your project with Kindon
Send us the vessel type, service environment, coating area or annual volume — our engineers will respond with a recommended coating system.